Get London Transfer Ltd is a TfL licensed private hire operator - London private hire operator licence number 11588.
getlondontransfer.co.uk and rushxo.co.uk are trading names of Get London Transfer Ltd. Every booking made on these websites is operated by Get London Transfer Ltd.
24/7 dispatch:WhatsApp Live DispatchCall 020 8888 9988

Home › Eurostar guide › Celestia fleet

The fleet · Alstom order

Celestia Trains Taxi – Fixed Price Quote, Book Online 24/7

Get an Instant Quote
TfL-licensed private hireFixed fares · no surge24/7 UK Support

Up to 50 new Alstom trains, €2 billion, and the first double-deck high-speed services ever to run beneath the sea — the fleet behind Eurostar's expansion.

Travelling by car? Rushxo quotes one fixed price before you book — no meter, no surge, no night premium. The fare you see is the fare you pay.
Get my fixed price →

Behind Eurostar's new routes sits a new fleet. Celestia, ordered from Alstom in a deal worth around €2 billion, will run to up to 50 trains, with the first six hoped to be carrying passengers by 2031.

The headline: two decks

They'd be the first double-deck high-speed trains ever to run through the Channel Tunnel — proven technology on the continent, where Deutsche Bahn and SNCF have run twin-deck trains for decades, but new beneath the sea. Each train stands 4.33 metres tall (16cm up on today's e320s) and 200 metres long; two coupled together seat 1,080 passengers.

Comfortable saloon car parked on a city street
Comfortable saloon car parked on a city street

What it unlocks

Eurostar expects roughly 20% more capacity, up to 50% less energy use per seat, and around 30% more trains serving London as older stock retires — the muscle behind the planned Frankfurt and Switzerland routes. Before any of that, each design must clear a years-long certification process for the Tunnel and every country it serves.

≤50 trains on order€2bn approximate deal value1,080 seats, two coupled2031 first six hoped in service
Getting to St Pancras

Every Eurostar journey starts with reaching the station on time. Rushxo runs fixed-fare private hire across London and the UK, 24/7 — the quote is the fare, with no surge for early starts or late arrivals. Book a St Pancras transfer, WhatsApp us, or call 020 8888 9988.

Quick answers

What are Celestia trains?

Eurostar's next-generation fleet from Alstom — up to 50 double-deck high-speed trains, the first of their kind to run through the Channel Tunnel, hoped in service from 2031.

How many passengers will Celestia carry?

Each 200-metre train seats around 540; two coupled together carry 1,080 — part of a roughly 20% capacity increase across the fleet.

Why do the new trains take so long to arrive?

High-speed trains must complete a years-long certification process for the Channel Tunnel and every national network they serve before carrying passengers.

← Back to the complete Eurostar guide
WhatsApp usCall 24/7