WhatsApp us:+44 7466 237870+44 7484 210583+44 20 8888 9988
Get London Transfer Ltd is a TfL licensed private hire operator - London private hire operator licence number 11588.
getlondontransfer.co.uk and rushxo.com are trading names of Get London Transfer Ltd, and rushxo.co.uk is the UK site of rushxo.com. Every booking made on these websites is operated by Get London Transfer Ltd.
LOWER THAMES CROSSING · DARTFORD · BOOK NOW
Kent to Essex, opening 2034

Lower Thames Crossing – What the New Tunnel Means for Dartford, Kent and Essex Journeys

Get an Instant Quote
TfL-licensed private hireFixed fares · no surge24/7 UK Support

A 2.6-mile tunnel under the Thames between Gravesend and Tilbury, approved in March 2025, with early works under way since March 2026 and an opening date of 2034. Here is the route, what it will and will not do for the Dartford Crossing, and how it changes airport and cruise transfers between Kent, Essex, Gatwick and Stansted.

The facts, as of September 2026

ItemDetail
Route14.3 miles of new road from the A2/M2 at Thong, east of Gravesend, under the Thames to Tilbury, then north to the A13 at Orsett and the M25 at junction 29
Tunnel2.6 miles (4.2 km), twin bore, three lanes each way; the longest road tunnel in the UK
ApprovalDevelopment Consent Order granted 25 March 2025
ConstructionEarly works began March 2026; main tunnelling to follow
Opening2034, pushed back from 2032
CostAbout £10.6 billion, £3.1 billion public and £7.5 billion private finance
ChargingExpected to be charged like the Dartford Crossing; rates not yet set

Sources: Lower Thames Crossing, Wikipedia and National Highways. Dates for a project of this size move; this page is reviewed each quarter.

What it does to the Dartford Crossing

The honest answer from the project’s own traffic modelling: the Dartford Crossing gets some relief but stays over capacity, and the total number of vehicles crossing the Thames east of London goes up, because the new road unlocks journeys that people do not make today. The Dartford tunnels and the QE2 bridge carry around 150,000 vehicles a day against a design capacity of 135,000, which is why a lorry breakdown on the bridge still puts an hour on a Kent-to-Stansted run. Until 2034, that is the road we plan around. The Dart Charge is £3.50 per car each way in 2026, payable by midnight the next day; we pay it and include it in the fare.

The Thames at Gravesend
The Thames at Gravesend · Photo: Walter Dendy, deceased, CC BY-SA 2.0 via Wikimedia Commons

The journeys it changes

The crossing is built for exactly the traffic a Kent and Essex transfer company carries: Kent and the Medway towns to Stansted; Essex to Gatwick; Southampton and Dover cruise passengers connecting to Stansted or Southend; and anyone from Gravesend, Rochester or Maidstone heading to the A13 corridor, Lakeside or Tilbury port. Today all of it funnels through Dartford. From 2034, a Gravesend to Stansted transfer joins the A2 at Thong, is under the river in a few minutes and picks up the M25 at junction 29 with the Dartford queue never in view. Our working estimate, based on the route length rather than any promise, is 20 to 35 minutes saved on a Medway-to-Stansted run at peak and 10 to 15 off-peak.

Journey todayRoute nowTypical time nowFrom 2034
Gravesend to Stansted AirportA2, Dartford Crossing, M25, M1160 to 90 minutesA2, Lower Thames Crossing, A13/M25, M11; peak queue removed
Maidstone to Southend AirportM20, Dartford Crossing, A1360 to 85 minutesM20/A2, tunnel, A13 direct
Chelmsford to Gatwick AirportA12, M25, Dartford Crossing, M25, M2380 to 110 minutesA12, M25 J29, tunnel, A2/M2, M20/M26, M23 option
Dover cruise terminal to StanstedA2/M2, Dartford Crossing, M25, M11100 to 130 minutesA2, tunnel, A13, M11; Dartford avoided entirely
Dartford or Bexley to HeathrowA2, A282 southbound, M25 anticlockwise, M470 to 100 minutesUnchanged: this traffic never crossed the river

Living with the construction, 2026 to 2034

The works sit on both banks: the A2 and A226 around Thong and Chalk on the Kent side, and the A13, A1089 and Tilbury on the Essex side, with the M25 junction 29 rebuilt late in the programme. Expect lane restrictions on the A2 east of Gravesend and on the A13 around Orsett for most of the build, and overnight closures announced week by week by National Highways. For fixed-fare transfers this changes nothing about the price, which is agreed in advance, and everything about the buffer we build in for airport runs from north Kent and south Essex, which is why we ask for the flight number rather than a pickup time.

Dartford, Gravesend and the crossing today

Rushxo and its sister brand Woodford Chauffeur Cars are based in Dartford, and the Dartford Crossing is the road we know best. If you are booking across the river now, the practical advice is unchanged: allow for the bridge, book by flight number, and let the fare include the Dart Charge so there is nothing to pay by midnight the next day. Fixed fares from Dartford and Gravesend to every London airport, the cruise terminals at Dover, Southampton and Tilbury, and the Essex side are on the intercity transfers page, and the airport hubs for Stansted and Gatwick carry the fares from Kent and Essex postcodes.

Dartford Crossing
Dartford Crossing · Photo: John Fielding from Norwich, UK, CC BY 2.0 via Wikimedia Commons

Common questions

When will the Lower Thames Crossing open?
2034, according to National Highways, pushed back from the original 2032. Early works began in March 2026.
Where is the Lower Thames Crossing?
Between Gravesend in Kent and Tilbury in Essex, about 10 miles east of the Dartford Crossing, linking the A2/M2 to the A13 and the M25 at junction 29.
Will the Lower Thames Crossing replace the Dartford Crossing?
No. Both will operate. The project’s own modelling says Dartford stays busy, with total river crossings increasing once the new route is open.
Will there be a toll on the Lower Thames Crossing?
A charge is expected, in the same style as the Dart Charge, but the rate has not been set. The Dart Charge for cars is £3.50 each way in 2026.
Does a Rushxo fare include the Dartford Crossing charge?
Yes. The Dart Charge and any tolls are included in the fixed fare you are quoted, so there is nothing to pay afterwards.
Is it quicker to go from Kent to Stansted via Dartford or the Blackwall Tunnel?
Dartford, almost always, except for pickups inside south-east London where the Blackwall or Silvertown tunnels and the A12 avoid the M25 entirely. We choose on the day from live traffic; the fare does not change.

Book a fixed fare across the Thames

Kent to Essex, Kent to Stansted, Essex to Gatwick. Crossing charges included, price agreed before you travel.

Call WhatsApp Your journey, perfectly priced.