WhatsApp us:+44 7466 237870+44 7484 210583+44 20 8888 9988
Get London Transfer Ltd is a TfL licensed private hire operator - London private hire operator licence number 11588.
getlondontransfer.co.uk and rushxo.com are trading names of Get London Transfer Ltd, and rushxo.co.uk is the UK site of rushxo.com. Every booking made on these websites is operated by Get London Transfer Ltd.
NEW DEVELOPMENTS · 2026 TO 2034 · BOOK NOW
2026 to 2034

New Transport Developments Around London and the South East – What They Mean for Airport and Intercity Journeys

Get an Instant Quote
TfL-licensed private hireFixed fares · no surge24/7 UK Support

A second runway at Gatwick, a second terminal at Luton, a Universal theme park outside Bedford, a new Thames tunnel between Kent and Essex, and the rail projects that connect them. One page, kept current, on what is approved, what is built, when it opens, and how each one changes the roads we drive every day.

The projects at a glance

ProjectWhereStatus, September 2026OpensJourneys it changes
Gatwick Northern RunwayGatwick Airport, West SussexFinal court approval 4 August 2026; design and delivery under wayDual-runway flights by 2030More early and late flights; works on the A23 approaches until then
Luton Airport expansionLuton, BedfordshireApproved 4 April 2025; phased buildPhases through the early 2030s; 32 million passengers by 2043Second terminal, more capacity on the Bedford and M1 corridor
Universal United Kingdom ResortKempston Hardwick, near BedfordPermission 16 December 2025; construction started 12 January 202620318.5 million visitors a year; Luton becomes the gateway airport; new East West Rail station
Lower Thames CrossingGravesend to Tilbury, Kent to EssexApproved 25 March 2025; early works from March 20262034Kent to Stansted, Essex to Gatwick and cruise-port connections stop depending on the Dartford Crossing
Silvertown TunnelGreenwich to Silvertown, east LondonOpen since April 2025, charged like the Blackwall TunnelOpenSouth-east London to London City Airport, ExCeL and the A13 without the Blackwall queue
Old Oak Common stationWest London, between Acton and WillesdenUnder construction as the HS2 terminus with Elizabeth line and Great Western platformsAround 2030 for the first services, subject to HS2’s timetableA new interchange for Heathrow-bound rail traffic from the north and west
Heathrow third runwayHeathrow AirportBacked by the government in January 2025; planning application still to be decidedNot before the mid-2030sNone yet; the M25 and A4 works would be the first visible change

Statuses and dates are checked against the promoters’ own announcements and reviewed each quarter. Where a project has a detailed page above, the page carries the sources.

What it adds up to for airport transfers

Three of the four big projects are about capacity at the airports north and south of London rather than at Heathrow, and the pattern for the next decade is clear. Gatwick and Luton grow first, Stansted keeps its position as the airport for Cambridge, Essex and north Kent once the Lower Thames Crossing opens, and Heathrow stays the long-haul hub with the same road access it has now. For passengers, that means more flights at the ends of the day from Gatwick and Luton, exactly the hours when the Gatwick Express, Thameslink and the Luton DART are thinnest. For anyone north of London, Luton becomes the airport for the Universal resort, a 20-mile hop that will be one of the busiest transfer corridors in the country from 2031.

Busy London street with traffic
Busy London street with traffic

What it adds up to for the roads

Between 2026 and 2034 the works themselves are the story: the A23 at Gatwick, the A421 and M1 junction 13 for Universal, the A2 east of Gravesend and the A13 at Orsett for the tunnel, and the terminal approaches at Luton. Our fixed fares do not change with the traffic, but our buffers do, which is why every airport booking asks for a flight number rather than a pickup time. From 2034 the map changes for good: a Kent-to-Essex journey stops meaning Dartford, and the cruise ports at Dover and Tilbury get a direct road to Stansted and Southend.

For tour operators, event organisers and businesses

If you plan itineraries or staff travel more than a season ahead, these projects are worth building into route planning now. Universal alone will change hotel demand across Bedford, Milton Keynes and Luton, and its opening year will look like a permanent bank-holiday weekend on the A421. Our trade transport page covers group vehicles and net rates, and the corporate travel page covers accounts with monthly invoicing for businesses moving people between these sites.

Tower Bridge, London, at night
Tower Bridge, London, at night

Common questions

When does Gatwick’s second runway open?
Dual-runway flights are expected by 2030, after final court approval on 4 August 2026.
Is Luton Airport getting a second terminal?
Yes. The expansion approved on 4 April 2025 includes a second terminal and capacity for 32 million passengers a year by 2043.
When does the Lower Thames Crossing open?
2034. Early works began in March 2026.
When does Universal Studios Bedford open?
2031. Construction began on 12 January 2026 at Kempston Hardwick, three miles south of Bedford.
Does the Silvertown Tunnel cost money to use?
Yes. It opened in April 2025 with a user charge, and the Blackwall Tunnel is charged alongside it. Tolls are included in our fixed fares.

Fixed fares to every airport, port and city

Tolls and crossing charges included. Price agreed before you travel.

Call WhatsApp Your journey, perfectly priced.